DFM/DFT

 
DFM/DFT

Sequiam’s team in China has a strong background in high volume manufacturing having previously managed production line with volumes in excess of one million units per month.

  1. Overview

Overview

Sequiam’s manufacturing team analyzes every project up front to determine both initial and future production volumes.  This process allows Sequiam to accurately project both the management efforts and investment required to manufacture and test the manufacturing lifecycle.  Often times this review helps Sequiam develop a two stage manufacturing approach to production.  Stage One production runs are designed for lower volumes and aim to reduce startup costs and lead-times for the customer.  Stage Two production scales from stage one and is where product designs and production tooling are enhanced to increase volumes with at the same time reduce per-unit production costs.

Every client that engages Sequiam for its manufacturing capabilities can be assured that the entire production lifecycle will be under continuous review in an attempt to identify areas where efficiencies can be implemented thereby reducing per-unit cost and lead times while simultaneously increase end-user product reliability.

Website Design by Steven Fiske